My customer decided it was time for a nice new modern bathroom installation.
Here is a before and after shot.
This section of photographs are the same area at different stages through the refit.
Removal of the old mobility bath and make shift shower.
The removal of old tiles is not an easy task and this bathroom particually needed alot of work.
the walls were very cracked and the plaster came off the walls so i had to remove it all and skim the whole bathroom.
my customer required something that was easier to access , so we chose a flat base large step in shower.
Also a modern white suite .